Map of Almere abstract by Maps Are Art

Buy this digital art artwork Map of Almere abstract by Maps Are Art as a reproduction on canvas, ArtFrame, poster and wallpaper, printed on demand in high quality.
1 Personalize your artwork
Material More about this material
Size
Complete set or interchangeable Art Print?
Choose the color of the frame
ArtFrame comes as a simple construction kit. View self-assembly instructions.
2 Choose extra options
Acoustic material
Total price
1 863 kr1 677 kr - 10 %
Or pay 3x 559.00 via Klarna
Preview at home
Art code 225686
Map of Almere abstract by Maps Are Art
Example of the artwork in a room
See it at home, on your wall
Download our app and enter work code 225686
Download for iOS Android
Already filled more than 350,000 walls!
4,686 customers rate us with a 4.8 / 5
Read our reviews
Example of the artwork in a room
  • Example of the artwork in a room
  • Example of the artwork in a room
  • Example of the artwork in a room
Get even more inspired
Made by

Maps Are Art

Amsterdam, Netherlands

About ‘Map of Almere abstract’ by Maps Are Art

The coloured areas on the map are all the buildings of the city of Almere. Each decade of the last century has a separate colour. Blue is the oldest, from before 1900, and brown/Orange areas are the most recently built. In the city centre, all the buildings that stand against each other are coloured according to the oldest building in…

Original created by Maps Are Art.

Discover our ArtFrame

The modern canvas alternative

Your chosen art on canvas, stretched in an aluminum frame. Quick and easy to change for a fresh look and exactly as you want it.

  • High-quality print
  • Easily replaceable
  • Acoustic function
  • Large formats possible
More about ArtFrame
4.8/5
Close