Zevenhoven (South-Holland) | Map | Black and white by Prints of Place

1 Personalize your artwork
Material More about this material
Size
Complete set or interchangeable cloth?
Choose the color of the frame
ArtFrame comes as a simple construction kit. View self-assembly instructions.
2 Choose extra options
Acoustic material
Total price
1 859 kr
Or pay 3x 619.66 via Klarna
Preview at home
Art code 1025184
Zevenhoven (South-Holland) | Map | Black and white by Prints of Place
See it at home, on your wall
Download our app and enter work code 1025184
Download for iOS Android
Already filled more than 325,000 walls!
4,301 customers rate us with a 4.8 / 5
Read our reviews
Get even more inspired

Buy Zevenhoven (South-Holland) | Map | Black and white by Prints of Place on canvas, ArtFrame, poster and wallpaper, printed on demand in high quality.

About "Zevenhoven (South-Holland) | Map | Black and white"

by Prints of Place

About the artwork

Black and white map, street map or street plan of Zevenhoven. Zevenhoven is located in the municipality of Nieuwkoop, province of South Holland. The town map includes all public roads in Zevenhoven. Furthermore, the map features the coordinates of the center of Zevenhoven.

Prints of Place Profile picture

About Prints of Place

This shop is the destination for anyone in search of unique city posters that are a perfect reflection of their favorite city or village. In the Netherlands, Germany, America, and beyond.

With a passion for travel and a love for design, we embarked on our journey with.. Read more…

Customer reviews

This artwork doesn't have reviews yet. 4,301 customers rate us with a 4.8 / 5

    Horst E.
    Germany
    5 / 5
    Verified review from Trusted Shops Ordered in February 2024
    André Bogers
    Netherlands
    5 / 5
    Verified review from Kiyoh Ordered in August 2021
    Rainer W.
    Germany
    5 / 5
    Verified review from Trusted Shops Ordered in June 2025
    Gabriel C.
    Germany
    5 / 5
    Verified review from Trusted Shops Ordered in November 2021
    Maarten
    Netherlands
    5 / 5
    Verified review from Kiyoh Ordered in May 2020
    Marianne
    Netherlands
    4.5 / 5
    Verified review from Kiyoh Ordered in May 2021
    Erik en Pauline
    Netherlands
    5 / 5
    Verified review from Kiyoh Ordered in November 2022
    martin k.
    Germany
    4 / 5
    Verified review from Trusted Shops Ordered in October 2019
    Mike
    Netherlands
    4.5 / 5
    Verified review from Kiyoh Ordered in March 2020
    Helma van Kooten
    Netherlands
    5 / 5
    Verified review from Google Ordered in March 2023
    John
    Netherlands
    4.5 / 5
    Verified review from Kiyoh Ordered in June 2020
    B. B.
    Germany
    5 / 5
    Verified review from Trusted Shops Ordered in August 2025

About the material

ArtFrame™

Interchangeable Art Prints

  • High-quality print
  • Easily interchangeable
  • Acoustic function
  • Large sizes available

More about ArtFrame™