Water chart of Walcheren in black and white by Maps Are Art

Buy this black and white artwork Water chart of Walcheren in black and white by Maps Are Art on canvas, ArtFrame, poster and wallpaper, printed on demand in high quality.
1 Personalize your artwork

Choose your material

From ArtFrame™ to wall-filling wallpaper. Pick your favorite and make it truly yours.

More options available
Material More about this material

Choose your size

From a small frame to a statement piece. Choose what fits your interior!

Choose your size

More options available
Size
Complete set or interchangeable Art Print?
Choose the color of the frame
Aluminum frames
Wooden frames New
ArtFrame comes as a simple construction kit. View self-assembly instructions.
2 Choose extra options
Acoustic material
Total price
2 336 kr
Art code 1208793
Art code copied
Water chart of Walcheren in black and white by Maps Are Art
You can't see it in full detail right now, but you certainly will on your wall soon!
Scroll to zoom in, drag to move the artwork. Drag with your finger to move the artwork.
View artwork larger
Close
Edit background and wallpaper
Example of the artwork in a room
See it at home, on your wall
Download our app and enter work code 1208793
Art code copied
Download for iOS Android
Already filled more than 375,000 walls!
5,152 customers rate us with a 4.8 / 5
Read our reviews
Example of the artwork in a room
  • Example of the artwork in a room
  • Example of the artwork in a room
  • Example of the artwork in a room
Get even more inspired

Get even more inspired

Example of the artwork in a room
Artist impression (not based on the entered sizes)
Example of the artwork in a room
Artist impression (not based on the entered sizes)
Example of the artwork in a room
Artist impression (not based on the entered sizes)
Made by

Maps Are Art

Amsterdam, Netherlands

About ‘Water chart of Walcheren in black and white’ by Maps Are Art

All Walcheren's lakes, rivers, canals, streams, ditches and other watercourses are depicted on this high-detail yet minimalist map. This is why it is not a land map but a water map. One of the great things about this type of map is that by only showing the water, other objects on land automatically come to the fore, such as forests,…

Original created by Maps Are Art.

Discover our ArtFrame

The modern canvas alternative

Your chosen art on a textile print, stretched in an aluminum or wooden frame. Quick and easy to change for a fresh look and exactly as you want it.

  • High-quality print
  • Easily replaceable
  • Acoustic function
  • Large formats possible
More about ArtFrame
4.8/5
Close

Your preferences

Choose the country you want the artwork shipped to.

Shipping country not available? Get in touch.