Vintage map of Strijensas (South Holland) by Prints of Place

1 Personalize your artwork
Material More about this material
Size
Complete set or interchangeable cloth?
Choose the color of the frame
ArtFrame comes as a simple construction kit. View self-assembly instructions.
2 Choose extra options
Acoustic material
Total price
1 859 kr
Or pay 3x 619.66 via Klarna
Preview at home
Art code 1039104
Vintage map of Strijensas (South Holland) by Prints of Place
See it at home, on your wall
Download our app and enter work code 1039104
Download for iOS Android
Already filled more than 325,000 walls!
4,307 customers rate us with a 4.8 / 5
Read our reviews
Get even more inspired

Buy this digital art artwork Vintage map of Strijensas (South Holland) by Prints of Place as a reproduction on canvas, ArtFrame, poster and wallpaper, printed on demand in high quality.

About "Vintage map of Strijensas (South Holland)"

by Prints of Place

About the artwork

Retro map of Strijensas, located in the municipality of Hoeksche Waard, province of South Holland. The map shows public roads, watercourses (lakes, streams and ditches) and forests in and around Strijensas. In addition, the map contains the coordinates of Strijensas.

Prints of Place Profile picture

About Prints of Place

This shop is the destination for anyone in search of unique city posters that are a perfect reflection of their favorite city or village. In the Netherlands, Germany, America, and beyond.

With a passion for travel and a love for design, we embarked on our journey with.. Read more…

Customer reviews

This artwork doesn't have reviews yet. 4,307 customers rate us with a 4.8 / 5

    Peter K.
    Germany
    5 / 5
    Verified review from Trusted Shops Ordered in March 2024
    Kai F.
    Germany
    5 / 5
    Verified review from Trusted Shops Ordered in March 2024
    Frank V.
    Germany
    5 / 5
    Verified review from Trusted Shops Ordered in January 2021
    André
    Netherlands
    5 / 5
    Verified review from Kiyoh Ordered in November 2018
    Thomas
    Netherlands
    5 / 5
    Verified review from Kiyoh Ordered in February 2020
    Marc Goorden
    Netherlands
    5 / 5
    Verified review from Kiyoh Ordered in July 2019
    Andrea J.
    Germany
    5 / 5
    Verified review from Trusted Shops Ordered in January 2023
    G S.
    Germany
    5 / 5
    Verified review from Trusted Shops Ordered in November 2023
    Olaf W.
    Germany
    5 / 5
    Verified review from Trusted Shops Ordered in December 2019
    Andreas K.
    Germany
    5 / 5
    Verified review from Trusted Shops Ordered in February 2025
    Brigitte N.
    Germany
    5 / 5
    Verified review from Trusted Shops Ordered in April 2022
    Rob
    Netherlands
    4.5 / 5
    Verified review from Kiyoh Ordered in April 2020

About the material

ArtFrame™

Interchangeable Art Prints

  • High-quality print
  • Easily interchangeable
  • Acoustic function
  • Large sizes available

More about ArtFrame™