Striep (Fryslan) | Map | Black and white by Prints of Place

Buy this black and white artwork Striep (Fryslan) | Map | Black and white by Prints of Place on canvas, ArtFrame, poster and wallpaper, printed on demand in high quality.
1 Personalize your artwork

Choose your material

From ArtFrame™ to wall-filling wallpaper. Pick your favorite and make it truly yours.

More options available
Material More about this material
Product details & specifications
Type
Textile fabric (interchangeable fabric) in an aluminium or wooden frame
Width
Aluminium: min. 30 cm – max. 15 m (other side max. 3 m)
Wood: min. 30 cm – max. 130 cm
Height
Aluminium: min. 30 cm – max. 15 m (other side max. 3 m)
Wood: min. 30 cm – max. 130 cm
Custom sizing
Made to measure, in steps of 1 cm
Frame thickness
25 mm Aluminium: 2–3 mm visible on the front
Wood: 0.5 cm visible on each side
Frame colours
Black, white, aluminium, gold
Wood: natural Ayous
Finish
Fabric: matte
Aluminium frame: matte (gold glossy)
Wooden frame: natural
Acoustic option
Yes (optional)
Sturdiness
Support bar included from 180 cm (aluminium frame)
Delivery
Self-assembly kit
Hanging
Wall mounts, or on a ceiling rail (see components)
Components
Frame, acoustic panel, wall mounts, eyelets for rail mounting (via customer service)
Not suitable for
Damp areas and outdoor use
Material
SEG textile
Acoustic material (B1 fire class, partly made from recycled PET bottles)

Components (frame, acoustic panel, wall mounts, rail mounting) can be ordered via customer service. A separate interchangeable fabric can only be hung if you already have an ArtFrame.

Choose your size

From a small frame to a statement piece. Choose what fits your interior!

Choose your size

More options available
Size
Complete set or interchangeable Art Print?
Choose the color of the frame
Aluminum frames
Wooden frames New
ArtFrame comes as a simple construction kit. View self-assembly instructions.
2 Choose extra options
Acoustic material
Total price
1 887 kr
Art code 1023800
Striep (Fryslan) | Map | Black and white by Prints of Place
You can't see it in full detail right now, but you certainly will on your wall soon!
Scroll to zoom in, drag to move the artwork. Drag with your finger to move the artwork.
View the artwork in AR Beta

View the artwork in the space where you are. Scan the QR code with your smartphone or tablet and follow the steps.

How does it work on Android?

Press 'View in AR'. Then point your Android phone or tablet at the wall where you want the artwork and follow the instructions on your screen.

Is the artwork not in the right place? Drag it across the screen with your finger to where you want it.

How does it work on iPhone or iPad?

Press 'View in AR'. Then point your iPhone or iPad at the wall where you want the artwork and follow the instructions on your screen.

Is the artwork not in the right place? Drag it across the screen with your finger to where you want it.

Tips for use
  • Point your camera at the floor or a piece of furniture first, then move it slowly up towards the wall. A bare white wall is hard for your phone to recognise.
  • Move your phone gently from side to side. Holding it still or waving it around quickly does not help.
  • Make sure there is enough light. In a dark room your phone has nothing to lock onto.
  • The artwork appears at its true size, so you cannot scale it in AR. Want a different size? Close AR and pick the size on the product page.
  • Still nothing? Open this page in Chrome or Safari. AR does not work in the browser of apps such as Instagram or Facebook.

Beta feature. You need an AR-capable device (a recent iPhone/iPad or Android). The AR view is only an indication; colour, size and finish may differ in reality.

Example of the artwork in a room
See it at home, on your wall
Download our app and enter work code 1023800
Download for iOS Android
Already filled more than 375,000 walls!
5,003 customers rate us with a 4.8 / 5
Read our reviews
Example of the artwork in a room
  • Example of the artwork in a room
  • Example of the artwork in a room
  • Example of the artwork in a room
Get even more inspired

Get even more inspired

Example of the artwork in a room
Artist impression (not based on the entered sizes)
Example of the artwork in a room
Artist impression (not based on the entered sizes)
Example of the artwork in a room
Artist impression (not based on the entered sizes)
Made by

Prints of Place

Amsterdam, Netherlands

About ‘Striep (Fryslan) | Map | Black and white’ by Prints of Place

Black and white map, street map or street plan of Striep. Striep is located on the Wadden, in the municipality of Terschelling, province of Fryslan. On the city map all public roads in Striep are included. Furthermore, the map is provided with the coordinates of the center of Striep.

Original created by Prints of Place.

Discover our ArtFrame

The modern canvas alternative

Your chosen art on a textile print, stretched in an aluminum or wooden frame. Quick and easy to change for a fresh look and exactly as you want it.

  • High-quality print
  • Easily replaceable
  • Acoustic function
  • Large formats possible
More about ArtFrame
4.8/5
Close

Your preferences

Choose the country you want the artwork shipped to.

Shipping country not available? Get in touch.